Panelling works at visitors gallery of Passenger Terminal Building in progress as on 21.08.2017
Panelling works at v...
Download
Arrival Hall Pasenger Terminal Building work in progress as on 19.08.2017(10)
Arrival Hall Pasenge...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(9)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(8)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(1)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(7)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(6)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(5)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(4)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(3)
Arrival Hall of Pass...
Download
Arrival Hall of Passenger Terminal Building in progress as on 19.08.2017(2)
Arrival Hall of Pass...
Download
Bank Consortium Team reviewing the progress of work at site on 18.08.2017(1)
Bank Consortium Team...
Download
Bank Consortium Team reviewing the progress of work at site on 18.08.2017 (6)
Bank Consortium Team...
Download
Bank Consortium Team reviewing the progress of work at site on 18.08.2017 (4)
Bank Consortium Team...
Download
Bank Consortium Team reviewing the progress of work at site on 18.08.2017 (3)
Bank Consortium Team...
Download
Bank Consortium Team reviewing the progress of work at site on 18.08.2017 (2)
Bank Consortium Team...
Download
Landscaping Works near Car park area in progress as on 18.08.2017
Landscaping Works ne...
Download
West elevation ACP Coping work of Pasenger Terminal Building in progress as on 18.08.2017
West elevation ACP C...
Download
Panelling work completed at East Side Future Office at 102m level of PTB in progress as on 17.08.2017
Panelling work compl...
Download
Construction of Passenger Terminal Building in progress as on 17.08.2017
Construction of Pass...
Download
Facade openable Window fixing at 108m level of Passenger Terminal Building in progress as on 17.08.2017
Facade openable Wind...
Download
West side glass fixing at Double Link Bridge above 113.1 level of Passenger Terminal Building in progress as on 16.08.2017
West side glass fixi...
Download
Interrogation Room outside laminate panelling at 102m level of Passenger Terminal Building in progress as on 16.08.2017
Interrogation Room o...
Download
Gypsum false ceiling works at 108.00m level of Passenger Terminal Building in progress as on 14.08.2107
Gypsum false ceiling...
Download
Passenger Terminal Building Arrival Hall work in progress as on 14.08.2017
Passenger Terminal B...
Download
Column Cladding work at Arrival Meet & Greet area of Passenger Terminal Building in progress as on 14.08.2017
Column Cladding work...
Download
Lighting works at 89.00m level Corridor of Passenger Terminal Building in progress as on 14.08.2017
Lighting works at 89...
Download
AHU Installation at 104.00m level of Passenger Terminal Building in progress as on 14.08.2017
AHU Installation at ...
Download
DG & Panel Commissioning actvities switch on at Air Traffic Control Tower as on 12.08.2017
DG & Panel Commissio...
Download
Airside Facade work of Passenger Terminal Building nearing completion as on 11.08.2017
Airside Facade work ...
Download
 
 