Installation Testing and Commissioning of Airfield Crash Fire Tender as on 20.01.2017
Installation Testing...
Download
Construction of Primary Approach Road RA 2-RA 5 in progress as on 18.01.2017
Construction of Prim...
Download
Construction of Passenger Terminal Building (Meet & Greet Area) in progress as on 18.01.2017
Construction of Pass...
Download
Joining of HT Cable from DG Yard to Passenger Terminal Building in progress as on 18.01.2017
Joining of HT Cable ...
Download
Construction of Service Block near Car Park Area  in progress as on 17_01_2017
Construction of Serv...
Download
Construction of Car Park Area in progress as on 17_01_2017
Construction of Car ...
Download
Roofing Work of Passenger Terminal Building in progress as on 16.01.2017
Roofing Work of Pass...
Download
Construction of Ramp from International Security Hold floor level to Passenger Boarding Bridge level in progress as on 16.01.2017
Construction of Ramp...
Download
Construction of Approach Road to BPCL Fuel Depot in progress as on 12.01.2017
Construction of Appr...
Download
Construction of Trapezoidal Drain in progress as on 12.01.2017
Construction of Trap...
Download
Laying of Cement Treated Subbase (CTSB) at Car Park area in progress as on 11.01.2017
Laying of Cement Tre...
Download
Construction of Round About-5 in progress as on 10.01.2017
Construction of Roun...
Download
Construction of Operational Perimeter Road near Air Traffic Control Building in progress as on 10.01.2017
Construction of Oper...
Download
Construction of DG Yard in progress as on 09.01.2017
Construction of DG Y...
Download
Construction of Air Traffic Control building in progress as on 09.01.2017
Construction of Air ...
Download
AirTraffic Control Tower ACP Cladding work in progress as on 05.01.2017
AirTraffic Control T...
Download
Construction of Motor Transport Workshop in progress as on 04.01.2017
Construction of Moto...
Download
Construction of fixed finger for Passenger Boarding Bridge in progress as on 03.01.2017
Construction of fixe...
Download
Laying OF DBM at Round About-5 in progress as on 31.12.2016
Laying OF DBM at Rou...
Download
Construction of Firestation East side in progress as on 31.12.2016(1)
Construction of Fire...
Download
RE(Reinforced Earth) Wall Construction at Resa 07 side in progress as on 30.12.2016
RE(Reinforced Earth)...
Download
A5 Taxiway WMM work at night in progress as on 29.12.2016
A5 Taxiway WMM work ...
Download
Site Inspection by Shri.Suresh Babu, Commissioner of Customs along with his officials as on 28.12.2016(1)
Site Inspection by S...
Download
Airfield Crash Fire Tenders arrived at site on 28.12.2016
Airfield Crash Fire ...
Download
Airfield Crash Fire Tender arrived at site on 28.12.2016
Airfield Crash Fire ...
Download
Installation of Ceiling Suspend Air Handling Unit in progress as on 27.12.2016
Installation of Ceil...
Download
Construction of DG Yard Building in progress as on 27.12.2016
Construction of DG Y...
Download
Application of Prime Coat & Construction of Kerb at Primary Approach Road RA 2-5 in progress as on 26.12.2016
Application of Prime...
Download
Construction of Passenger Terminal Building in progress as on 26.12.2016
Construction of Pass...
Download
Facade work of Passenger Terminal Building in progress as on 24.12.2016
Facade work of Passe...
Download
 
 