Installation of Passenger Boarding Bridge in progress as on 28.04.2017
Installation of Pass...
Download
Construction of Air Traffic Control Building in progress as on 27.04.2017
Construction of Air ...
Download
Laying of BC(Bituminous Concrete) at Parallel Taxi Track in progress as on 20.04.2017
Laying of BC(Bitumin...
Download
Construction of FireStation West side nearing completion as on 19.04.2017
Construction of Fire...
Download
False ceiling work at 89m level of Passenger Terminal Building in progress as on 18.04.2017
False ceiling work a...
Download
Construction of Air Traffic Control building in progress as on 15.04.2017
Construction of Air ...
Download
Laying of BC(Bituminous Concrete) at Parallel Taxi Track in progress as on 11.04.2017
Laying of BC(Bitumin...
Download
Construction of Motor Transport Workshop in progress as on 11.04.2017
Construction of Moto...
Download
Installation of Diesel Generator at DG Yard in Progress as on 07.04.2017
Installation of Dies...
Download
False Ceiling work at 102.00m level of Passenger Terminal Building in Progress as on 07.04.2017
False Ceiling work a...
Download
Laying of Paralink at RE Wall Construction in progress as on 03.04.2017
Laying of Paralink a...
Download
Geophysical Investigation using GPR(Ground Penetrating Radar) at Isolation Bay area in progress as on 03.04.2017
Geophysical Investig...
Download
Construction of Planter Box above flyover in progress as on 01.04.2017
Construction of Plan...
Download
Laying of Paver Blocks near Primary Approach Road in progress as on 29.03.2017
Laying of Paver Bloc...
Download
False ceiling work at Arrival hall of Passenger Terminal Building in progress as on 25.03.2017
False ceiling work a...
Download
Laying of BC at Car Park area in progress as on 25.03.2017
Laying of BC at Car ...
Download
Roofing work of Passenger Terminal Building in progress as on 24.03.2017
Roofing work of Pass...
Download
Electrical Panel Installation at102.00m level of Passenger Terminal Building in progress as on 22.03.2017
Electrical Panel Ins...
Download
Construction of UG Sump near Passenger Terminal Building in progress as on 20.03.2017
Construction of UG S...
Download
Construction of CarPark area in progress as on 18.03.2017
Construction of CarP...
Download
Facade work of Passenger Terminal Building in progress as on 17.03.2017
Facade work of Passe...
Download
Construction of DG Yard in progress as on 14.03.2017
Construction of DG Y...
Download
Laying of DBM Dense Bituminous Macadam at Car Park area in progress as on 14.03.2017
Laying of DBM Dense ...
Download
Construction of Air Traffic Control Building in progress as on 10.03.2017
Construction of Air ...
Download
Installation of Passenger Boarding Bridge in progress as on 08.03.2017
Installation of Pass...
Download
Facade work of Passenger Terminal Building in progress as on 07.03.2017
Facade work of Passe...
Download
Installation of Passenger Boarding Bridge in progress as on 07.03.2017
Installation of Pass...
Download
Site visit by Hon\'ble MP Shri Richard Hay on 06.03.2017
Site visit by Hon'bl...
Download
Construction of Car Park Area in progress as on 06.03.2017
Construction of Car ...
Download
Construction of Kerb at Car Park Area in progress as on 04.03.2017
Construction of Kerb...
Download
 
 